Sidewalk work

The sidewalk along Arkansas Street, connecting Stuart Springs to Highway 284, is nearing completion. Employees with Henry Peacock Construction prepare the area over the ditch on Arkansas Street for the concrete sidewalk to be poured.

The sidewalk along Arkansas Street, connecting Stuart Springs to Highway 284, is nearing completion. Employees with Henry Peacock Construction prepare the area over the ditch on Arkansas Street for the concrete sidewalk to be poured.

Subscribe to the Times-Herald E-Edition. Already an E-Edition subscriber, Login Here to view our E-Edition

Recommended for you